Project Description:
Project management of works to the Heritage listed Dukes Dock Pump House, which has the original steam driven pumps. Works included:
- The dry docking of the Polly Woodside
- Sealing the two 800mm diameter main intake suction pipes and the two 250mm diameter auxiliary intake suction pipes
- Facilitation of the anti-foul treatment to the hull of the Polly Woodside by the National Trust
Project Details
Client: Major Projects Victoria
The Challenge:
- Heritage listed site and the associated management
- Management and co-ordination across multiple stakeholders
The Outcome:
Presentation of the historical pump house and Dukes Dock
Sealing of the intake pipes to prevent further corrosion of the pumps and equipment in the pump house